| [1] |
ZHANG Hongliang, XU Gongjie, BAO Qiang, YU Lean.
Flexible job-shop green scheduling considering transportation time and machine preventive maintenance
[J]. Computer Integrated Manufacturing System, 2024, 30(9): 3111-3124.
|
| [2] |
ZHANG Jun, ZHENG Bin, HE Pan.
Optimization of multi-state aperiodic inspection strategy in software rejuvenation
[J]. Computer Integrated Manufacturing System, 2024, 30(7): 2453-2463.
|
| [3] |
YAO Chengyu, LIU Xiaobo, CHEN Dongning, ZHANG Yunpeng, LYU Shijun.
Survival evolution stage-search particle swarm optimization algorithm and its reliability redundancy allocation optimization application
[J]. Computer Integrated Manufacturing System, 2024, 30(6): 1959-1971.
|
| [4] |
YANG Liang, LIU Qinming, YE Chunming, DONG Ming, HU Jiarui.
Preventive maintenance strategy of equipment considering energy efficiency
[J]. Computer Integrated Manufacturing System, 2024, 30(4): 1422-1432.
|
| [5] |
YIN Yanchao, SU Yifan, TANG Jun, LIN Wenqiang, PU Haoran, WANG Linyu.
Process production process quality prediction algorithm fused with Mar-G LSTM
[J]. Computer Integrated Manufacturing System, 2024, 30(3): 942-957.
|
| [6] |
HONG Zhaoxi, TAN Jianrong, HE Lili, HU Bingtao, ZHANG Zhifeng, SONG Xiuju, FENG Yixiong.
Reliability optimization design for product key structure based on integration dimension-reduction considering high-dimensional heterogeneous uncertainties
[J]. Computer Integrated Manufacturing System, 2024, 30(12): 4152-4167.
|
| [7] |
CHEN Youdong, LIU Zhuo.
Industrial robots reliability assessment based on two-stage Gamma process
[J]. Computer Integrated Manufacturing System, 2024, 30(12): 4477-4483.
|
| [8] |
LIAN Xiaozhen, HOU Liang, ZHANG Wenbo, YAN Huasheng, CHEN Jiancheng.
Selection method of design scheme for LCD products based on RA and DFMEA
[J]. Computer Integrated Manufacturing System, 2024, 30(11): 3799-3814.
|
| [9] |
ZHANG Xinyu, LIU Qinming, YE Chunming, LI Jiaxiang.
Multi-objective phased maintenance outsourcing strategy of complex equipment considering optimal interests of both parties to the contract
[J]. Computer Integrated Manufacturing System, 2023, 29(9): 3055-3065.
|
| [10] |
HAN Sijie, WANG Haiqing, ZHENG Wei, ZHOU Wenan.
Reliability estimation for petrochemical safety devices under multiple timing censored data
[J]. Computer Integrated Manufacturing System, 2023, 29(4): 1107-1114.
|
| [11] |
LU Zhiqiang, QIAN Yue.
Joint optimization of assembly scheduling and equipment maintenance based on assembly deviation prediction
[J]. Computer Integrated Manufacturing System, 2023, 29(3): 811-823.
|
| [12] |
XU Yingcui, SI Guojin, MIAO Rui, XIA Tangbin.
Joint optimization for product warranty and preventive maintenance in service supply chain
[J]. Computer Integrated Manufacturing System, 2023, 29(3): 824-832.
|
| [13] |
PAN Zhiqiang, ZHU Shuo, JIANG Zhigang, ZHANG Hua, YAN Wei.
Processing elements data-driven method for remanufactured products process reliability prediction
[J]. Computer Integrated Manufacturing System, 2023, 29(3): 833-842.
|
| [14] |
ZHANG Jinchun, LYU Hang, HOU Jinxiu.
Reliability optimization model for k-out-of-n:G systems based on mixed redundancy strategy
[J]. Computer Integrated Manufacturing System, 2023, 29(3): 852-863.
|
| [15] |
DU Zunling, ZHANG Yimin.
Mechanical efficiency reliability and sensitivity of axial piston pump
[J]. Computer Integrated Manufacturing System, 2023, 29(2): 522-531.
|