[1]IATA’s Maintenance Cost Task Force.Airline maintenance cost executive commentary:an exclusive benchmark analysis (FY2010 data)[EB/OL].[2013-07-10].http://www.iata.org/whatwedo/workgroups/Documents/MCTF/AMC-ExecComment-FY10.pdf.
[2]Air Force SBIR/STTR.Workscope optimization tool contributes to lower maintenance costs and higher reliability in aircraft engines[EB/OL].[2013-07-10].http://www.afsbirsttr.com/Publications/Documents/Advantage2&3Q2009.pdf.
[3]YONG Chengxi.Research and development of civil aero engine shop visit planning system[D].Nanjing:Nanjing University of Aeronautics & Astronautics,2008(in Chinese).[雍成喜.民航发动机送修方案制定及其应用系统开发[D].南京:南京航空航天大学,2008.]
[4]TANG Xinmin.Aero-engine workshop maintenance procedure modeling based on petri nets and its application[D].Harbin:Harbin Institute of Technology,2007(in Chinese).[汤新民.基于Petri网的航空发动机车间维修过程建模及其应用研究[D].哈尔滨:哈尔滨工业大学,2007.]
[5]WANG Jianrong,YU Tianbiao,WANG Wanshan.Integrating analytic hierarchy process and genetic algorithm for aircraft engine maintenance scheduling problem[J].Advances in Intelligent and Soft Computing,2010,66:897-915.
[6]SUO Haibo.Analysis model studies on maintenance level decision of CFM56 engine[D].Guanghan:Civil Aviation Flight University of China,2012(in Chinese).[索海波.CFM56发动机送修等级决策分析模型研究[D].广汉:中国民用航空飞行学院,2012.]
[7]FU Xuyun,ZHONG Shisheng,DING Gang.Civil aero-engine module workscope decision-making[J].Journal of Aerospace Power,2010,25(10):2195-2200(in Chinese).[付旭云,钟诗胜,丁 刚.民用航空发动机单元体送修工作范围决策[J].航空动力学报,2010,25(10):2195-2200.]
[8]YILMAZ I.Evaluation of the relationship between exhaust gas temperature and operational parameters in CFM56-7B engines[J].Journal of Aerospace Engineering,2009,223(4):433-440.
[9]YUAN Feng,ZUO Hongfu.Research on calculation of aero engine performance deterioration rate[J].Aviation Maintenance & Engineering,2009(2):46-48(in Chinese).[袁风,左洪福.航空发动机性能衰退率计算方法研究[J].航空维修与工程,2009(2):46-48.]
[10]PAN Hongyu.Time series analysis[M].Beijing: University of International Business and Economics Press,2006:39-61(in Chinese).[潘红宇.时间序列分析[M].北京:对外经济贸易大学出版社,2006:39-61.]
[11]MARLER R T,ARORA J S.Survey of multi-objective optimization methods for engineering[J].Structural and Multidisciplinary Optimization,2004,26(6):369-395.
[12]WANG Yue.Analysis of aeroengine fleet stagger management[J].Aviation Maintenance & Engineering,2011(5):84-86(in Chinese).[王悦.浅谈航空公司发动机机队的梯次管理[J].航空维修与工程,2011(5):84-86.]
[13]WANG Yue.CFM56-7B shop visit schedule management[J].Aviation Maintenance & Engineering,2012(2):94-96(in Chinese).[王悦.CFM56-7B发动机送修时机选择[J].航空维修与工程,2012(2):94-96.] |