[1]GOLDRATT E M,COX J.The goal:a process of ongoing improvement[M].Geat Barrington,Mass.,USA:The North River Press,1992.
[2]GOLDRATT E M.Critical chain[M].Geat Barrington,Mass.,USA:The North River Press,1997.
[3]NEWBOLD R C.Project management in the fast lane:applying the theory of constrains[M].Boca Raton,Fla.,USA:The St Lucie Press,1998.
[4]STEYN H.Project management applications of the theory of constraints beyond critical chain scheduling[J].International Journal of Project Management,2002,20(1):75-80.
[5]HOEL K,TAYLOR S G.Quantifying buffers for project schedules[J].Production and Inventory Management Journal,1999,40(2):43-47.
[6]TUKEL O I,ROM W O,EKSIOGLU S D.An investigation of buffer sizing techniques in critical chain scheduling[J].European Journal of Operational Research,2006,172(2):401-415.
[7]CHU Chunchao.Buffer sizing and critical chain project management[J].Computer Integrated Manufacturing Systems,2008,14(5):1029-1035(in Chinese).[褚春超.缓冲估计与关键链项目管理[J].计算机集成制造系统,2008,14(5):1029-1035.]
[8]XIE X,YANG G,LIN C.Software development projects IRSE buffer settings and simulation based on critical chain[J].The Journal of China Universities of Posts and Telecommunications,2010,17(S1):100-106.
[9]BIE L,CUI N F,ZHANG X.Buffer sizing approach with dependence assumption between activities in critical chain scheduling[J].International Journal of Production Research,2012,50(24):7343-7356.
[10]LIU D Y,CHEN J G,WEI P.A new buffer setting method based on activity attributes in construction engineering[J].Applied Mechanics and Materials,2012,174-177:3274-3281.
[11]BIE Li,CUI Nanfang.Capacity constraint buffer sizing method for critical chain multi-project sceduling[J].Computer Integrated Manufacturing Systems,2011,17(7):1534-1540(in Chinese).[别黎,崔南方.关键链多项目管理中能力约束缓冲大小研究[J].计算机集成制造系统,2011,17(7):1534-1540.]
[12]RADOVILSKY Z D.A quantitative approach to estimate the size of the time buffer in the theory of constraints[J].Internal Journal of Production Economics,1998,55(2):113-119.
[13]LONG L D,OHSATO A.Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J].International Journal of Project Management,2008,26(6):688-698.
[14]ZHAO Zhiyou.Study on duration buffer in critical chain project management[J].Journal of University of Electronic Science and Technology of China:Social Sciences Edition,2008,10(6):22-27(in Chinese).[赵之友.关键链项目计划制定中的工期裕量问题研究[J].电子科技大学学报,2008,10(6):22-27.]
[15]ZHONG Gang,QI Jianxun,SU Zhixiong.Study on method for buffer placing in critical chain management with fuzzy duration[J].Technology Economics,2009,28(7):48-50 (in Chinese).[仲刚,乞建勋,苏志雄.基于模糊工期的关键链缓冲区设置方法研究[J].技术经济,2009,28(7):48-50.]
[16]YANG Lixi,LI Shiqi,HUANG Xiabao,et al.A buffer sizing approach in critical chain scheduling with attributes dependent[J].Industrial Engineering and Management,2009,14(1):11-14 (in Chinese).[杨立熙,李世其,黄夏宝,等.属性相关的关键链计划缓冲设置方法[J].工业工程与管理,2009,14(1):11-14.]
[17]PARKINSON C N.Parkinson’s law or the pursuit of progress[M].London,UK:Penguin Books,1947.
[18]KRAKOWSKI M.PERT and parkinson’s law[J].Interfaces,1974,5(1):35-40.
[19]GUTIERREZ G J.Parkinson’s law and its implications for project management[J].Management Science,1991,37(8):990-1001.
[20]ROBINSON H,RICHARDS R.Critical chain project management:motivation & overview[C]//Proceedings of Aerospace Conference.Washington,D.C.,USA:IEEE,2010:1-10. |