[1] CHANG Xiangqing, NING Ruxin. Assembly planning and evaluation oriented assembly feature modeling [J]. Computer Integrated Manufacturing Systems, 2001, 7(12): 35-38(in Chinese). [常向青,宁汝新. 面向装配工艺规划与评价的装配特征模型[J]. 计算机集成制造系统, 2001, 7(12): 35-38.] [2] LIU Wenjian, JIN Tianguo. Research state and development directions of product top-down design [J]. Computer Integrated Manufacturing Systems, 2002, 8(1): 1-7(in Chinese). [刘文剑,金天国. 产品自顶向下设计的研究现状及发展方向[J]. 计算机集成制造系统, 2002, 8(1):1-7.]
[3] SONG Yuying, YE Beihua, CAI Fuzhi,et al. Study on integrated design for assemely[J]. Chinese Journal of Mechanical Engineering, 1999, 35(5): 67-71(in Chinese). [宋玉银,叶蓓华,蔡复之,等. 集成化面向装配的设计研究[J]. 机械工程学报, 1999, 35(5): 67-71.]
[4] HOLLAND van W, BRONSVOORT W F. Assembly features in modeling and planning [J]. Robotics and Computer Integrated Manufacturing,2000,16:277-294.
[5] SONG Yuyin, CAI Fuzhi, ZHANG Bopeng. Concurrent engineering-oriented product assembly model [J]. Journal of Tsinghua University (Sci&Tech), 1999, 39(4): 49-52(in Chinese). [宋玉银,蔡复之,张伯鹏. 面向并行工程的产品装配模型[J]. 清华大学学报(自然科学版), 1999, 39(4): 49-52.]
[6] PAN Dong, ZHANG Shensheng, BU Fenglin, et al. Prototype of an assembly based current design support system for CAD [J]. Journal of Computer-Aided Design & Computer Graphis, 1998, 10(1):59-68(in Chinese). [潘 东,张申生,步丰林,等. 基于装配关系的CAD并行设计支持系统原型的研究[J]. 计算机辅助设计与图形学学报, 1998, 10(1): 59-68.]
[7] FU Yili, TIAN Lizhong, DONG Zhengwei, et al. Concurrent engineering-oriented product assembly model [J]. Computer Integrated Manufacturing Systems, 2003,2(2): 149-153(in Chinese). [付宜利,田立中,董正卫,等. 装配关系的有向图表达方法研究[J]. 计算机集成制造系统, 2003, 2(2):149-153.]
[8] YU Yazhen, WU Jun, GE Qiaoqin. A new solution method for assembly relation of parts [J]. CAD/CAM, 1996,(12): 21-24(in Chinese). [俞亚珍,吴 俊,葛巧琴. 装配零件位置关系求解新方法[J].计算机辅助设计与制造, 1996,(12):21-24.]
|