• 论文 •    

多干扰的资源约束项目调度问题

陈庭贵,琚春华   

  1. 1.浙江工商大学 计算机与信息工程学院,浙江杭州310018;2.浙江工商大学 现代商贸中心,浙江杭州310018
  • 出版日期:2012-11-15 发布日期:2012-11-25

Resource-constrained project scheduling problem with multi-factor disruptions

CHEN Ting-gui, JU Chun-hua   

  1. 1.College of Computer Science and Information Engineering, Zhejiang Gongshang University, Hangzhou 310018, China;2.Contemporary Business and Trade Research Center, Zhejiang Gongshang University, Hangzhou 310018, China
  • Online:2012-11-15 Published:2012-11-25

摘要: 针对项目调度过程中经常出现的干扰情况,首先对其类型与干扰恢复策略进行描述和分析,并建立多因素干扰的项目调度模型;然后结合设计结构矩阵,提出一种改进的局部搜索算法求解该问题;最后引入某数值项目调度实例详细阐述了该模型与方法的实施过程,并对相关影响因素进行了分析与讨论,计算结果表明了所提模型与方法的实用性和有效性。

关键词: 项目调度, 干扰管理, 设计结构矩阵, 局部搜索

Abstract: Aiming at the disruptions existing in project scheduling, the types of disruptions and recovery strategies were described and analyzed, and resource-constrained project scheduling model based on disruption management was set up. Combined with design structure matrix, an improved local searching algorithm was proposed to solve the disruption problems. A certain numerical project scheduling example was given to demonstrate the implementation steps and process of proposed model. In addition, relevant influencing factors were discussed and analyzed. The results showed the validity and practicality of proposed model and method.

Key words: project scheduling, disruption management, design structure matrix, local searching

中图分类号: