Optimization method of integration job shop scheduling of overhaul and manufacture and computer manufacturing system of intercity railway rolling stock
WANG Zhongkai1,SHI Tianyun1+,ZHANG Weijiao1,XIONG Sheng2,WANG Hui1
1.Institute of Computing Technologies,China Academy of Railway Sciences
2.China Railway Siyuan Survey and Design Group Co.,Ltd.
Online:2023-08-31
Published:2023-09-12
Supported by:
Project supported by the National Natural Science Foundation,China(No.U2268205).
WANG Zhongkai, SHI Tianyun, ZHANG Weijiao, XIONG Sheng, WANG Hui. Optimization method of integration job shop scheduling of overhaul and manufacture and computer manufacturing system of intercity railway rolling stock[J]. Computer Integrated Manufacturing System, 2023, 29(8): 2773-2791.