| [1] |
WANG Yuwen, MING Weiwei, ZHANG Zhinan.
Sheet metal part sorting sequence planning based on dual-arm co-axial truss robot
[J]. Computer Integrated Manufacturing System, 2024, 30(5): 1770-1778.
|
| [2] |
ZHANG Kaixiang, MAO Jianlin, XUAN Zhiwei, XIANG Fenghong, FU Lixia.
Hierarchical scheduling based multi-robot path planning for pass terrain
[J]. Computer Integrated Manufacturing System, 2024, 30(1): 172-183.
|
| [3] |
YUAN Youwei, WU Haotian, ZHANG Xuefeng, LI Wanqing, LI Zhongjin, QIU Renzhi.
Energy aware workflow offloading strategy based on quality of service
[J]. Computer Integrated Manufacturing System, 2023, 29(9): 3018-3027.
|
| [4] |
LEI Bin, JIN Yantong, LIU Hailong.
Job scheduling of cross layer shuttle-based storage system combined with FJSP problem
[J]. Computer Integrated Manufacturing System, 2023, 29(8): 2751-2760.
|
| [5] |
XIONG Fuli, WANG Linting.
Joint optimization of inter order scheduling and intra order scheduling for just-in-time precast production
[J]. Computer Integrated Manufacturing System, 2023, 29(4): 1205-1217.
|
| [6] |
HU Haiyang, LI Qianhui, LI Zhongjin.
Real-time task offloading algorithm based on genetic algorithm in production environment
[J]. Computer Integrated Manufacturing System, 2023, 29(4): 1254-1266.
|
| [7] |
ZHOU Min, YU Mouyu, ZHENG Guolei.
Tool selection method for numerical control machining of rocket tank panels based on genetic algorithm
[J]. Computer Integrated Manufacturing System, 2023, 29(2): 385-391.
|
| [8] |
SHAN Xiaohang, ZHANG Heng, XIE Yi.
Two stage coevolutionary genetic algorithm with two dimensional coding for cloud workflow scheduling
[J]. Computer Integrated Manufacturing System, 2023, 29(2): 568-580.
|
| [9] |
CHENG Zhijiang, LI Zhiwen, DU Yiming.
Optimized active disturbance rejection trajectory tracking control for mobile cleaning manipulator
[J]. Computer Integrated Manufacturing System, 2023, 29(12): 3993-4000.
|
| [10] |
WANG Ruixin, CHEN Weifang, ZHOU Yanfeng, CUI Rongfang, LIANG Ruijun.
Multi-step machining path optimization of five-axis machine tool with four-spindle heads
[J]. Computer Integrated Manufacturing System, 2023, 29(11): 3717-3726.
|
| [11] |
JI Chenlu, LIN Fei, YANG Zhongping, WU Xiaobo, WANG Chao, SHA Donglei.
Bi-level programming model of AGV wireless charging system considering charging path
[J]. Computer Integrated Manufacturing System, 2023, 29(11): 3762-3773.
|
| [12] |
TANG Hongtao, ZHENG Zhiheng, LI Yingde, CHEN Qingfeng, JIANG Weiguang.
Group scheduling problem of profile blanking workshop using AGV sorting
[J]. Computer Integrated Manufacturing System, 2023, 29(1): 100-110.
|
| [13] |
ZHU Yongguo, WANG Xin, LIU Linhui, ZHUO Xin, HU Huishun.
Comprehensive optimization of spraying trajectory for complex surface based on multi-factor model and multi-scale genetic algorithm
[J]. Computer Integrated Manufacturing System, 2023, 29(1): 264-273.
|
| [14] |
ZUO Yuanzheng, HUANG Changbiao, ZHANG Xuhui.
Optimization of multi-point contact cutter orientation based on genetic algorithm
[J]. Computer Integrated Manufacturing System, 2022, 28(8): 2449-2459.
|
| [15] |
HUANG Peng, YAO Xifan, HU Xiaoyang, ZENG Zhongrong.
Two-stage hybrid optimization algorithm for large-scale automated warehouse storage location assignment problem
[J]. Computer Integrated Manufacturing System, 2022, 28(8): 2481-2495.
|