| [1] |
LI Shiyun, YANG Mengping, YI Wenchao, PEI Zhi.
Hybrid discrete differential evolution algorithm for distributed heterogeneous hybrid flowshop scheduling problem
[J]. Computer Integrated Manufacturing System, 2025, 31(7): 2515-2528.
|
| [2] |
LI Wengui, YAO Youjie, LI Xinyu.
Integration scheduling of flexible job shop with heterogeneous AGVs
[J]. Computer Integrated Manufacturing System, 2025, 31(5): 1539-1554.
|
| [3] |
ZHANG Zelin, LI Hongfei, WANG Lei, GUO Yuyao, XIA Xuhui.
Selection method of remanufacturing process scheme considering low carbon
[J]. Computer Integrated Manufacturing System, 2025, 31(4): 1314-1325.
|
| [4] |
ZHU Yunhai, LUO Lufeng, LU Qinghua, WANG Jinhai, WEI Huiling, HUANG Guowei.
Flexible job shop dynamic scheduling method for order disturbance
[J]. Computer Integrated Manufacturing System, 2025, 31(3): 984-997.
|
| [5] |
WEI Guangyan, YE Chunming.
Multi-objective dual resource constrained flexible job shop energy-efficient scheduling with transfer time
[J]. Computer Integrated Manufacturing System, 2025, 31(1): 67-88.
|
| [6] |
LIU Lu, SONG Haicao, JIANG Tianhua, DENG Guanlong, GONG Qingtao.
Modified biology migration algorithm for dual-resource energy-saving flexible job shop scheduling problem
[J]. Computer Integrated Manufacturing System, 2024, 30(9): 3125-3141.
|
| [7] |
HU Ruiqi, CHENG Hui, ZHANG Zhinan.
Solving job shop scheduling problem with flexible process sequence based on expression tree model
[J]. Computer Integrated Manufacturing System, 2024, 30(6): 2036-2043.
|
| [8] |
WANG Yanhong, ZHAO Yejian, LIU Wenxin.
Application of data mining algorithm in job shop scheduling problem
[J]. Computer Integrated Manufacturing System, 2024, 30(2): 520-536.
|
| [9] |
BA Zhiyong, YUAN Yiping, PEI Guoqing, WANG Bo.
Hybrid evolutionary algorithm with multi-operation precise joint movement neighborhood structure for job shop scheduling problem
[J]. Computer Integrated Manufacturing System, 2024, 30(2): 537-552.
|
| [10] |
ZHANG Guohui, ZHANG Deyu, YAN Shaofeng, ZHANG Haijun, YU Nana.
Flexible job shop scheduling with worker collaboration and learning effect
[J]. Computer Integrated Manufacturing System, 2024, 30(12): 4369-4385.
|
| [11] |
LIANG Xiaolin, JIANG Zhigang, ZHU Shuo, ZHANG Hua, YAN Wei, ZHANG Chenggen.
Energy-saving scheduling method for flexible job shop integrating equipment status control
[J]. Computer Integrated Manufacturing System, 2024, 30(11): 3889-3900.
|
| [12] |
ZHONG Hongyang, LIU Jianjun, HAN Xing, CHEN Qingxin, MAO Ning.
Integrating part outsourcing and sharing decision in flexible assembly job shop scheduling
[J]. Computer Integrated Manufacturing System, 2024, 30(11): 3901-3917.
|
| [13] |
ZHANG Congyi, LI Xinyu, XIA Kai, ZHANG Chunjiang, WANG Sihan.
Assembly job shop scheduling algorithm based on right-shift repair coding method
[J]. Computer Integrated Manufacturing System, 2024, 30(10): 3514-3524.
|
| [14] |
WANG Yanhong, YIN Tao, TAN Yuanyuan, ZHANG Jun, LI Dong, CUI Yue.
Dispatching rule and Q-learning based dynamic job shop scheduling algorithm
[J]. Computer Integrated Manufacturing System, 2024, 30(10): 3535-3546.
|
| [15] |
LIU Jiapu, ZHAO Taoyan, CAO JiangTao, LI Ping.
Soft sensor modeling method based on MSADE-IT2FNN and its applications
[J]. Computer Integrated Manufacturing System, 2023, 29(9): 2908-2919.
|