| [1] |
ZHANG Yongping, ZUO Ying, LIU Bo, HU Tianliang, LIU Tingyu, LIU Xiaojun, LYU Haiyang, ZHU Yiming, SHI Yiming, WU Heng, HE Honghong, SUN Hanlin, ZHANG Yifan, HU Pengfei, ZOU Xiaofu, LI Ruiqi, WANG Zitong, TAO Fei.
Digital twin shop-floor manufacturing operations management platform
[J]. Computer Integrated Manufacturing System, 2024, 30(1): 1-13.
|
| [2] |
HUANG Yansong, YAO Xifan, JING Xuan, HU Xiaoyang.
DQN-based AGV path planning for situations with multi-starts and multi-targets
[J]. Computer Integrated Manufacturing System, 2023, 29(8): 2550-2562.
|
| [3] |
WANG Chuang, FENG Yaqian, ZHOU Guanghui, LI Han.
Data integration and service approach for multi-view oriented digital twin manufacturing cell
[J]. Computer Integrated Manufacturing System, 2023, 29(7): 2139-2150.
|
| [4] |
XU Jinghua, SHENG Hongsheng, GAO Mingyu, ZHANG Shuyou, LIU Xiaojian, TAN Jianrong.
Adaptive forward design for slicing of additive manufacturing based on ring neighborhood
[J]. Computer Integrated Manufacturing System, 2023, 29(7): 2363-2375.
|
| [5] |
TENG Hao, ZHUANG Zilong, HUANG Zizhao, QIN Wei, QIN Tao, ZOU Ying.
Improved artificial bee colony algorithm for automatic terminal horizontal transportation scheduling
[J]. Computer Integrated Manufacturing System, 2023, 29(7): 2449-2460.
|
| [6] |
ZHENG Menglei, TIAN Ling.
Blockchain-based collaborative evolution method for digital twin ontology model of mechanical products
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1781-1794.
|
| [7] |
YANG Xin, FAN Zhengang, RAN Yan, ZHANG Genbao, WANG Zhichao, CHEN Yifan.
Construction of digital twin model for transmission system based on meta-action theory
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1795-1810.
|
| [8] |
ZHOU Guanghui, ZOU Yongcheng, ZHANG Chao, CHANG Fengtian, MEN Songchen.
Digital twin modeling method for complex assembly process considering multidimensional error
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1824-1839.
|
| [9] |
HUANG Hua, LI Jiaran, ZHAO Qiuge, ZHI Xiaobo.
Adaptive update method of digital twin model for feed system based on hybrid drive
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1840-1851.
|
| [10] |
ZHANG Chunlin, ZHOU Tingting, HU Tianliang, XIAO Guangchun, CHEN Zhaoqiang.
Construction method of digital twin model for cutting tools under variable working conditions
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1852-1866.
|
| [11] |
ZHOU Shengwen, GUO Shunsheng, DU Baigang, WANG Lei, GUO Jun, LI Yibing, PENG Zhao, YU Lei.
Digital twin model construction method of water treatment plant
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1867-1881.
|
| [12] |
WANG Yanqing, YAN Yuehui, MA Songhua, WEI Yongli, YUE Pengjun, HU Tianliang.
Fine modeling method of digital twin geometric model for rolling bearing#br#
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1882-1893.
|
| [13] |
ZHANG Zaifang, SUN Jin, GAO Nan, LEI Han.
Diagnosis of pulmonary nodules using digital twins
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1894-1904.
|
| [14] |
XIAO Zheng, CHENG Shupei, ZHENG Dongwei, YAN Junwei, LOU Ping, WANG Xinggang.
AGV path planning method for workshop driven by digital twin
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1905-1915.
|
| [15] |
YIN Yanchao, LI Wang, TANG Jun, YIN Yanlei.
Development of digital twin system for process manufacturing workshop driven by data/model fusion
[J]. Computer Integrated Manufacturing System, 2023, 29(6): 1916-1929.
|