[1]CHENG T C E. A heuristic for common due-date assignment and job scheduling on parallel machines[J]. Journal of the Operational Research Society, 1989, 40(12): 1129-1135.
[2]LIU Min, WU Cheng, YANG Yingjie. Genetic algorithm method based on combinatorial rules in identical parallel machine scheduling problem[J]. Acta Electronica Sinica, 2000,28(5):52-54(in Chinese). [刘民, 吴澄, 杨英杰. 并行多机调度问题的一种基于组合规则的遗传算法[J]. 电子学报, 2000,28(5): 52-54.]
[3]YI Yang, WANG Dingwei. Scheduling grouped jobs on parallel machines with setups [J]. Computer Integrated Manufacturing Systems,2001,7(7):7-11(in Chinese). [衣扬, 汪定伟. 并行多机成组工作总流水时间调度问题[J]. 计算机集成制造系统, 2001,7(7):7-11.]
[4]CENTENO G, ARMACOST R L. Parallel machine scheduling with release time and machine eligibility restrictions[J]. Computers and Industrial Engineering, 1997,33(1-2):273-276.
[5]MEYR H. Simultaneous lotsizing and scheduling on parallel machines[J].European Journal of Operational Research, 2002,139(2):277-292.
[6]JEONG H I, PARK J, LEACHMAN R C. Batch splitting method for a job shop scheduling problem in an MRP environment[J]. International Journal of Production Research, 1999,37(15):3583-3598.
[7]TSUJIMURA Y, GEN M, KUBOTA E. Solving fuzzy assembly-line balancing problem with genetic algorithms[J]. Computers and Industrial Engineering, 1995,29(1-4):543-547.
[8]CHENG Runwei, GEN M, TOZAWA T. Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms[J]. Computers and Industrial Engineering, 1995,29(1-4):513-517.
|