Loading...
Toggle navigation
Home
About Journal
Journal Introduction
Collected Condiction
Impact Factor
Editorial Board
Current Editorial Boards
Previous Editorial Boards
Board of Directors
Journal Online
Forthcoming Articles
Current Issue
Highlights
Archive
Most Read Articles
Most Download Articles
Most Cited Articles
Join In
Instruction
Subscription
Contacts Us
中文
Table of Content
25 July 2004, Volume 10 Issue 7
Previous Issue
Next Issue
Article
Study on Manufacturing Cell Reconfiguration for Agile Manufacturing
WANG Zhi-liang, ZHANG You-liang, WANG Hui-fen
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Research on logistics and information network integrating remanufacturing and manufacturing system
GU Qiao-lun,,CHEN Qiu-shuang
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Heterogeneous knowledge syntheses for manufacturing information systems
XU Qi, Robin Qiu
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Architecture and key technology for business process management
TAN Wei, FAN Yu-shun
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Algorithm-type knowledge management system
JIANG Zu-hua, YAN Jun-qi, CAI Hong
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Research on method of multi-dimensional workflow management under agile manufacturing environment
YAO Yi-yong, ZHAO Li-ping,
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Modeling of product development process with graphical evaluation and review technique
GUO Jian-fei, QIAO Li-hong
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Manufacturing quality control model oriented to product
LIU Ming-zhou,REN Lan
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Maintainability model supporting concurrent product design
LIU An-qing, HAO Jian-ping, YU Yong-li, WANG Song-shan
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Data management model for aerial project based on timed Petri net
SUN Jian-ling, HAN Yi, LI Yuan
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Monitoring approach of schedule progress in fractal web-based cooperative manufacturing system
DONG Hong-zhao,, LIU Dong-xu, ZHAO Yan-wei, CHEN Ying
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Shop floor model based on resource reconfiguration
SHANG Wen-li,,WANG Cheng-en,ZHANG Shi-jie
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
consignment-sales inventory resource in distribution
WANG Feng-chun, YAN Ping, LIU Fei, HE Xiao-hui
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Research of partner enterprise selection in supply chainmanagement based on support vector machine
ZHANG Hui, ZHANG Hao, XU Zheng, LU Jian-feng
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Optimization scheduling strategy oriented to cigarette producing line
CHEN Zhuang, LIU Yong-mei, CUI Guan-xun, HE Zhao-quan
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Selection of scheduling rules based on genetic algorithm and process simulation
ZHENG Feng, SUN Shu-dong
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Genetic algorithm for resource-constrained project scheduling
LIAO Ren, CHEN Qing-xin, MAO Ning
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Genetic algorithm for resource-constrained project scheduling
LIAO Ren, CHEN Qing-xin, MAO Ning
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Bi-directional convergence ACO for job-shop scheduling
WANG Chang-qing, CAO Yun-fu, DAI Guo-zhong
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Improved large neighborhood search algorithm for vehicle routing problem with time windows
LIU Xiao-lan, HAO Zhi-feng, WANG Guo-qiang, FU Ke-qiang
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Concurrent optimization of assembly sequence based on constraint release strategy
YANG Bo,,HUANG Ke-zheng,WANG Hui,CHEN Hong-wu
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Improvement of connectivity sieve algorithms for disassembly AND/OR graph
CHEN Hai-feng, GAO Jian-gang, LU Run-min
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Constitution of aid-oriented process repository and knowledge-capture method
GAO Wei ,YIN Guo-fu ,CHENG Er-jing
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Techniques and standardization of PCB data exchange
LI Yu-shan, YANG Gang, ZENG Xiang-yong, CAI Gu-shun,GUO Ning, FAN Yong, LI Ting, LIU Li, WANG Chong-guang
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Optimization of preventive maintenance policy of manufacturing equipment based on simulation
HAN Bang-jun, FAN Xiu-min, MA Deng-zhe
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Study on modified time series method of data correct in petrochemical equipment
HUANG Chun-peng, XIA Mao-sen
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
Quick quote system for bridge crane based on Internet
YING Bao-sheng, YI Jian-gang, ZHANG Hua
2004, 10(7): 0-0.
References
|
Related Articles
|
Metrics
Abstract
(
)
2024 Vol.30 No.3
Current Issue
Archive
Journal Information
Established in 1995, Monthly
Competent Organization:
China North Industries Gourp Corporation
Organizer:
Institute No.210, CNGC
Editorial Committee Director:
Li peigen
Chief Editor:
Wang jianmin
ISSN:
1006-5911
CN:
11-5946/TP
Email:
cims_journal@qq.com
Download
More>>
paper template
publishing and copyright
Contribution guidelines
links
More>>
科学技术部
科学技术部高技术研究发展中心
Research Center of CIMS Engineering
Chinese Journal of Mechanical Engineering
China Association for Science and Technology
Robot Technique and Application