Optimal foraging algorithm based on cumulative prospect theory for multi-objective flow-shop scheduling problems
朱光宇, 丁晨
Computer Integrated Manufacturing System . 2022, (3): 690 -699 .  DOI: 10.13196/j.cims.2022.03.004