Computer Integrated Manufacturing System ›› 2025, Vol. 31 ›› Issue (3): 939-954.DOI: 10.13196/j.cims.2023.0757

Previous Articles     Next Articles

Integrated optimization of flexible flow-shop scheduling and machine maintenance with rigid-flexible hybrid constraints

ZHAO Ziye1,CHEN Xiaohui1+,AN Youjun2,HU Xinyang3,ZHOU Mengying3,LIU Shengwang3   

  1. 1.College of Mechanical and Vehicle Engineering,Chongqing University
    2.College of Mechanical and Power Engineering,China Three Gorges University
    3.Intel Products(Chengdu)Co.,Ltd.
  • Online:2025-03-31 Published:2025-04-02
  • Supported by:
    Project supported by the National Key R&D Program,China(No.2022YFB3303600),the Fundamental Research Funds for the Central Universities,China(No.2022CDJKYJH048),and the Chongqing Municipal Natural Science Foundation,China(No.CSTB2023NSCQ-LZX0167).

刚柔混合约束下柔性流水车间生产调度与设备维护集成优化

赵子夜1,陈晓慧1+,安友军2,胡欣阳3,周梦萦3,刘盛望3   

  1. 1.重庆大学机械与运载工程学院
    2.三峡大学机械与动力学院
    3.英特尔产品(成都)有限公司
  • 作者简介:
    赵子夜(1997-),女,河南永城人,博士研究生,研究方向:生产调度优化、智能运维与智能算法,E-mail:zhaoziye_zzy@163.com;

    +陈晓慧(1969-),女,重庆人,教授,博士,博士生导师,研究方向:高端装备智能运维、质量与可靠性工程、工业工程与物流工程,通讯作者,E-mail:chenxiaohui@cqu.edu.cn;

    安友军(1992-),男,湖北宣恩人,副教授,博士,硕士生导师,研究方向:生产调度、可靠性与维修性工程,E-mail:anyoujun@126.com;

    胡欣阳(1995-),男,江西南昌人,工业工程师,本科,研究方向:生产系统仿真,E-mail:xinyang.hu@intel.com;

    周梦萦(1993-),女,湖北孝感人,工业工程师,硕士,研究方向:物流仿真与生产计划排程,E-mail:mengying.zhou@intel.com;

    刘盛望(1984-),男,四川广安人,工业工程师,本科,研究方向:生产调度,E-mail:eric.liu@intel.com。
  • 基金资助:
    国家重点研发计划资助项目(2022YFB3303600);中央高校基本科研业务费资助项目(2022CDJKYJH048);重庆市自然科学基金资助项目(CSTB2023NSCQ-LZX0167)。

Abstract: To improve equipment reliability and production efficiency,the integrated optimization of production scheduling and machine maintenance was studied within a semiconductor assembly and test flexible flow-shop,characterized by multi-variety mixed-line production and limited machine capacity.Considering the rigid-flexible hybrid constraints of buffer capacity and due window,an integrated optimization mathematical model was developed to minimize the makespan,average flow time,earliness/tardiness penalty and machine workload extreme deviation.To solve the problem efficiently,an Improved Bi-population Cooperative Evolutionary Algorithm(IBCEA)was proposed.In IBCEA,a hybrid initialization method was introduced to generate a high-quality initial population,and a hybrid local search strategy integrating Variable Neighborhood Search(VNS)and Orthogonal Learning(OL)was designed to enhance algorithm performance.In the numerical simulations based on the assembly and test production line of a semiconductor enterprise in Chengdu,the effectiveness and superiority of improved operators and proposed IBCEA were verified through algorithm comparison.

Key words: flexible flow-shop, integrated optimization of production scheduling and machine maintenance, limited buffer, due window, improved bi-population collaborative evolutionary algorithm

摘要: 为提高设备可靠性与生产效率,针对具有多品种混线生产和机器产能限定的半导体封装测试柔性流水车间,开展了生产调度与设备维护集成优化研究。构建了一个多目标集成优化数学模型,该模型考虑了有限缓冲区和交货期时间窗刚柔混合约束,并以最小化最大完工时间、平均流经时间、提前/拖期完工惩罚和机器负荷极差为优化目标。为实现高效求解,提出一种改进的双种群协同进化算法,该算法采用混合初始化方法生成高质量初始种群,并利用结合变邻域搜索和正交学习的混合局部搜索策略提高算法性能。以成都某半导体企业的封装测试产线为案例开展数值仿真实验,并通过对比分析验证了改进算子和所提算法的有效性与优越性。

关键词: 柔性流水车间, 生产调度与设备维护集成优化, 有限缓冲区, 交货期时间窗, 改进双种群协同进化算法

CLC Number: