Multi-bottleneck scheduling algorithm for large-scale Job Shop
ZHAI Ying-ni, SUN Shu-dong, YANG Hong-an, NIU Gang-gang, YUAN Zong-yin
Key Lab of Contemporary Design and Integrated Manufacturing Technology, Ministry of Education, Northwestern Polytechnical University, Xi'an 710072, China
[1]PINEDO M L. Scheduling:theory, algorithms, and systems[M]. Upper Saddle River, N.J.,USA:Prentice Hall,2008.
[2]JIN Feng, WU Cheng. Research status and prospects for massive production scheduling[J]. Computer Integrated Manufacturing Systems,2006,12(2):161-168(in Chinese).[金锋,吴澄.大规模生产调度问题的研究现状与展望[J].计算机集成制造系统,2006,12(2):161-168.]