考虑工艺约束的多阶耦合集成调度问题优化
苏章圣, 邓超, 钱斌, 胡蓉, 陈波
Optimization of class of multi-stage coupled integrated scheduling problem with process constraints
SU Zhangsheng, DENG Chao, QIAN Bin, HU Rong, CHEN Bo
计算机集成制造系统 . 2024, (3): 1072 -1091 .  DOI: 10.13196/j.cims.2022.1009