考虑时间窗和装载约束的装配线集成物流调度
吴倩云,谢乃明,邵雨婷
Integrated logistics scheduling of assembly lines with time windows and loading constraints
计算机集成制造系统 . 2020, (第3): 806 -814 .  DOI: 10.13196/j.cims.2020.03.022